NO | DESCRIPTIONS | DURATION / PERIOD | LOCATION | CLIENTS |
---|---|---|---|---|
1 | To Supply Manpower for NDT Services (PT) – Shah Alam
| September 2024 - Present
| Sri Takada Workshop, Shah Alam
| Sri Takada Industries (M) Sdn Bhd
|
2 | Provision of Computed Radiography (CR) Inspection for SEA Hibiscus
| August 2024 - Present
| Sabah & Labuan (Onshore & Offshore)
| Velosi (M) Sdn Bhd
|
3 | To Supply Manpower for Digital Radiography (DR) – Petronas Chemical Fertilizer Kedah
| August 2024 - Present
| Gurun, Kedah
| Altec Industrial & Engineering Supply Sdn Bhd
|
4 | Provision of Minor Fabrication, Offshore Installation and Testing For Structure and Piping (West Malaysia) E&P O&M Services Sdn Bhd (EPOMS) – FSO Sepat: NDT Equipment and Manpower Package ABS Findings Close Out Part 1 2024 (MT, PT)
| July 2024 - Present | Terengganu | HHA Associates Sdn Bhd
|
5 | Provision Of Offshore Host Tie-In (HTI) And Brownfield Modification Works For CPOC Phase 6 Project For ADB & JKA Platform – NDT Work (UT)
| July 2024 - Present
| Kota Bharu, Kelantan
| HHA Associates Sdn Bhd
|
6 | Provision of Maintenance, Construction and Modification (CM) and Turnaround (TA) Services for Petronas Floating LNG 1 & 2
| May 2024 - Present
| Labuan & Kota Kinabalu, Sabah
| Nuri Cerah Sdn Bhd
|
7 | Fabrication & Erection for Kerry Ingredients Shah Alam – NDT Work (RT,MT,PT)
| March 2024 - Present
| GFC Workshop, Bukit Palong, Lukut & Kerry Ingredients Plant, Shah Alam
| Grace Field Cooperation Sdn Bhd
|
8 | Provision Of Engineering, Procurement, Construction Commissioning + Installation (EPCC+I) Of Lightweight Structure (LWS), Duyong Brownfield Modification And Host Tie-In For PM6 & 12 Gansar Project – NDT Works (RT, MT, PT)
| March 2024 - Present
| Duyong & Gansar Platform, Kemaman
| HHA Associates Sdn Bhd
|
9 | To supply Manpower Services for Radiography Testing (RT), Computed Radiography (CR) and Digital Radiography (DR) for 5 years at MLNG, Sarawak
| February 2024 - Present
| Bintulu, Sarawak
| Affinity Test Services Sdn Bhd
|
10 | Provision of Procurement And Construction For The Rejuvenation Of Existing Crude Maleic Anhydride (Man) Plant For Petronas Chemicals MTBE Sdn Bhd – NDT Work
| February 2024 - Present
| Gebeng, Kuantan
| Esstar Vision Construction Sdn Bhd
|
11 | Provision of Minor Fabrication, Offshore Installation and Testing For Structure and Piping (West Malaysia) E&P O&M Services Sdn Bhd (EPOMS) - NDT Work ( RT,MT,PT,UT)
| October 2023 – Present
| Larut A Platform, Terengganu
| HHA Associates Sdn Bhd
|
12 | Provision of PAN Malaysia Inspection Services For Basic NDT & Advance NDT Inspection for Upstream & Downstream Sabah
NDT Work (API Inspectors, Painting Inspectors, IRATA , CRT, RT, UTTM, C-Scan, PAUT, ECT, RFET, IRIS, APR) | September 2023 – Present | Petronas Sabah Assets.
- All Terminal in Sabah | Nuri Cerah Sdn Bhd / Petronas Carigali / Petronas Chemical
|
13 | Provision for 3rd Party Services for NDT Manpower & Equipment For FSO Sepat WBT 5S Permanent Hull Repair
| September 2023 – Present
| Sepat Platform, Terengganu
| HHA Associates Sdn Bhd
|
14 | Provision of Minor Fabrication, Offshore Installation and Testing For Structure and Piping (West Malaysia) E&P O&M Services Sdn Bhd (EPOMS) - NDT Work ( RT,MT,PT,UT)
| October 2023 – Present
| Larut A Platform, Terengganu
| HHA Associates Sdn Bhd
|
15 | Provision of PAN Malaysia Inspection Services For Basic NDT & Advance NDT Inspection for Upstream & Downstream Sabah
NDT Work (API Inspectors, Painting Inspectors, IRATA , CRT, RT, UTTM, C-Scan, PAUT, ECT, RFET, IRIS, APR) | September 2023 – Present
| Petronas Sabah Assets.
- All Terminal in Sabah | Nuri Cerah Sdn Bhd / Petronas Carigali / Petronas Chemical
|
16 | Provision for 3rd Party Services for NDT Manpower & Equipment For FSO Sepat WBT 5S Permanent Hull Repair
| September 2023 – Present
| Sepat Platform, Terengganu
| HHA Associates Sdn Bhd
|
17 | Provision of Pan Malaysia Inspection Services – Advance Non- Destructive Testing (ANDT Package A) For Petronas Dagangan Berhad Sabah – NDT Work (API 653, API 510, MFL, C-Scan, UT Crawler, Vacuum Test, Tank Survey)
| Sept. 2023 – Present
| Sabah PDB Terminal – All Assets
| Nuri Cerah Sdn Bhd/ Petronas Dagangan Berhad Sabah
|
18 | Provision of Intergrated Hook Up Commissioning (iHUC) Services For Petronas Carigali Sdn Bhd – NDT Work (RT/MT/PT/UT/UTTG) – Bekok Platform
| Sept. 2023 – Present
| Bekuk Platform, Terengganu
| HHA Associates Sdn Bhd
|
19 | The Long Term Master Service Agreement (MSA) For Preventive And Corrective Maintenance Work At Pengerang Terminal (Two) Sdn Bhd (PT2SB) – NDT Work (RT,UT,MT,PT,HT,FT,PMI) | January 2020 – Present | Pengerang, Johor | Dialog Plant Services Sdn Bhd |
20 | Toyo – Aqua Wastewater Treatment Plant Project – NDT Work (RT/MT/PT/FT/PMI/HT)
| June 2023 - Present
| Poratha Workshop, Port Dickson
| Poratha Corporation Sdn Bhd
|
21 | Diesel Station Supply & Installation SBH Kibing Solar New Materials – NDT Work (RT/MT/PT)
| May 2023 - Present
| Thermal Tech Yard, Putatan, Sabah
| Thermal Tech Engineering & Services Sdn Bhd
|
22 | Provision of Intergrated Hook Up Commissioning (iHUC) Services For Petronas Carigali Sdn Bhd – NDT Work (RT/MT/PT/UT/UTTG) – Bekok Platform
| Sept. 2023 – Present
| Bekuk Platform, Terengganu
| HHA Associates Sdn Bhd
|
23 | Provision Of NDT Services For Port Dickson Workshop & PCFK Gurun Project – NDT Work (RT/MT/PT/HT/FT/PMI)
| June 2023 - Present
| Poratha Workshop, Port Dickson
| Poratha Corporation Sdn Bhd
|
24 | Toyo – Aqua Wastewater Treatment Plant Project – NDT Work (RT/MT/PT/FT/PMI/HT)
| June 2023 - Present
| Poratha Workshop, Port Dickson
| Poratha Corporation Sdn Bhd
|
25 | Diesel Station Supply & Installation SBH Kibing Solar New Materials – NDT Work (RT/MT/PT)
| May 2023 - Present
| Thermal Tech Yard, Putatan, Sabah
| Thermal Tech Engineering & Services Sdn Bhd
|
26 | RFCC Repair Works At P-216 A – NDT Works (RT,MT, PWHT, PMI & HT)
| May 2023 - Present
| Poratha Workshop & RAPID, Pengerang, Johor
| Poratha Corporation Sdn Bhd
|
27 | Provision of NDT Services for INTEL Mechanical & Piping Works for Intel Kulim, Kedah
| April 2023 – Present
| Intel / Seremban Eng, Kulim Kedah
| Seremban Engineering Sdn Bhd
|
28 | Linde Pelican1410A4HK – NDT Works (RT, PT, PAUT)
| February 2023 - Present
| Bayan Lepas, Penang
| Grace Field Corporation Sdn Bhd
|
29 | Project Sahara Rose – EPCC Services for Melamine Plant For Petronas Chemical Fertilizer – NDT Work (RT, MT, PT /HT/PAUT & PMI)
| February 2023 - Present
| Gurun, Kedah
| Dialog E & C Sdn Bhd
|
30 | Bintulu Additional Gas Sales Facilities (BAGSF2) – NDT Work (HT, PWHT, RT, MT)
| September 2022 - Present
| Bintulu, Sarawak
| Poratha Corporation Sdn Bhd / MLNG
|
31 | NDT Work at Pulau Indah (RT)
| June 2022 - Present
| Pulau Indah, Selangor
| Oriental Steel Pipe Sdn Bhd
|
32 | P20455 PT2SB – The Long Term Master Service Agreement For Preventive NDT Work For RGTF CF Renewal At PT2SB (UTTM, PT, MT, Boroscope, Eddy Current Testing, API 510 / API 570 / API 653 Inspector)
| April 2022 – Present
| Pengerang, Johor | Dialog Plant Services Sdn Bhd |
NO | DESCRIPTIONS | DURATION / PERIOD | LOCATION | CLIENTS |
---|---|---|---|---|
1 | Provision Of Non-Destructive Testing For SSGP Mechanical Project – KP51.9 Inspection On Pipe Body Due To Coating Damage, NDT Work (PAUT/PMI/HT/MT)
| April 2023 – January 2024
| SSGP KP51.9, Beaufort, Sabah
| PBJV Group Sdn Bhd / Amalgamated Plant Engineering Sdn Bhd
|
2 | Radiographic Testing – Digital (RT-D) on Impeller Turbine Blade
| April 2023 – December 2023
| Subang, Selangor
| Systemair Sdn Bhd
|
3 | NDT Services for Jingxing Papermill, Mahkota, Banting, Selangor – NDT Work (RT/MT/PMI/PAUT)
| October 2022 – September 2023
| Banting, Selangor
| CEEC Hunan Thermal Power (M) Sdn Bhd
|
4 | Provision Of NDT Services (PAUT,UT,MT,PT) For SSGP Mechanical Maintenance Project (Sarawak – Sabah Pipeline)
| October 2020 – July 2023
| Lawas, Sarawak
| Sunmow Construction Sdn Bhd / Amalgamated Plant Engineering Sdn Bhd/ PBJV Group Sdn Bhd
|
5 | Project Sahara Rose – EPCC Services for Melamine Plant For Petronas Chemical Fertilizer – NDT Work (RT, PT, PMI)
| April 2023 – July 2023
| Dialog Workshop, Kerteh, Terengganu
| Dialog E & C Sdn Bhd
|
6 | Provision Of Non-Destructive Testing For SSGP Mechanical Project – KP52 Verification Dig Up & Pipe Replacement, NDT Work (UT, MT, HT & PAUT)
| April 2023 – May 2023
| SSGP,Beaufort, Sabah
| PBJV Group Sdn Bhd / Amalgamated Plant Engineering Sdn Bhd |
7 | Term Contract For Sabah Sarawak Mechanical Pipeline Maintenance (KP201.8, Site) – NDT Works (MT,HT,UT,PAUT)
| October 2022 – December 2022
| SSGP, Lawas, Sarawak
| Amalgamated Plant Engineering Sdn Bhd
|
8 | Term Contract For Sabah Sarawak Mechanical Pipeline Maintenance (KP201.8, Welder Qualification Test, workshop) – NDT Works (RT,MT)
| October 2022 – November 2022
| Amal Site Yard Ladang Baru, Lawas, Sarawak
| Amalgamated Plant Engineering Sdn Bhd
|
9 | Installation Project Of 30000Nm3/h Air Seperation Unit located at Lot 6293 & 6294, Kawasan Perindustrian Telok Kalong, 24000 Kemaman, Terengganu for Messrs. Eastern Steel Sdn Bhd – NDT Work (RT)
| September 2022 – June 2023
| Kemaman, Terengganu
| CR Sea (Malaysia) Sdn Bhd
|
10 | SK Nexilis Plant Project (Pipeline) – NDT Works (RT)
| August 2022 – October 2022
| KKIP, Sepanggar, Sabah
| North Borneo Inspection Sdn Bhd
|
11 | DH2201 - Provision of Engineering, Procurement, Construction And Commissioning Of Titanium NBL Outside Battery Limit
(N-OSBL) Facility Project For Pengerang Integrated Complex – PWHT Work | June 2022 – May 2023
| Pengerang, Johor | Dialog E & C Sdn Bhd
|
12 | Seawater Piping Replacement – NDT Works (RT,MT,PT)
| May 2022 – December 2022 | Puchong, Selangor
| AIG Holdings Sdn Bhd
|
13 | Top Glove TSR F44SLP Phase 1 Piping Project - NDT Works (RT,MT,Vacuum Box Test)
| May 2022 – December 2022
| Banting, Selangor
| Seremban Engineering Berhad
|
14 | RAPID Package 3, DHT Rebuild (TML) – UTTM Work
| April 2022 – June 2022
| Pengerang, Johor
| Dialog Plant Services Sdn Bhd
|
15 | Provision of 3rd Party Services For NDT Manpower And Equipments For Berantai Q1 Campaign 2022 (RT,MT,PT)
| April 2022
| Kemaman, Terengganu
| HHA Associates Sdn Bhd
|
16 | Provision of 3rd Party Services For NDT Manpower And Equipment For TNAG Flowline (RT,MT,PT)
| March 2022
| Kemaman, Terengganu
| HHA Associates Sdn Bhd |
17 | Thermal Power Plant for 1,400 KTPA High-Grade Recycled Pulp and Industrial Packaging Paper Project Phase 1 / Jingxing Papermill – NDT Works (RT,PT)
| February 2022 – October 2022
| Banting, Selangor
| Sinohydro Corporation (M) Sdn Bhd
|
18 | Air Product – NDT Work (RT,PT)
| February 2022 – March 2022
| Klang, Selangor
| Gases System Eng. Services Sdn Bhd
|
19 | Provision of Engineering, Procurement, Construction And Commissioning Of Titanium NBL Outside Battery Limit (N-OSBL) Facility Project For Pengerang Integrated Complex – NDT Work (RT,MT,PT,HT,FT,PMI,PWHT)
| January 2022 – May 2023
| Pengerang, Johor
| Dialog E & C Sdn Bhd
|
20 | Qatargas – North Field Production Sustainability Investment 1 Project 1 - NDT Works (RT Crawler)
| December 2021 – February 2022
| Pasir Gudang, Johor
| Oceaneering Ltd. Co.
|
21 | Electromechanical Erection Works, DHT Rebuild – NDT Works (PWHT,RT,UT,PMI,HT,MT,PT,FT)
| October 2021 – April 2022
| RAPID Pengerang, Johor
| Poratha Corporation Sdn Bhd
|
22 | MDPC – RT Anomaly Hot work & RT Inspection Campaign, Kikeh Platform (Offshore RT activity)
| September 2021 – November 2021
| Labuan/ Sabah
| Oceancare Corporation Sdn Bhd
|
23 | Provision of 3rd Party Services For NDT Manpower And Equipment For Jitang Platform (RT,MT,PT)
| September 2021 – October 2021
| Kemaman, Terengganu | HHA Associates Sdn Bhd
|
24 | Provision of 3rd Party Services To Supply NDT Manpower And Equipment For Cakerawala Platform (RT,MT,PT)
| September 2021 – October 2021
| Kemaman, Terengganu
| HHA Associates Sdn Bhd
|
25 | Provision of Radiography Testing (RT) at Erb West, Kota Kinabalu
| September 2021
| Sabah
| Oceancare Corporation Sdn Bhd
|
26 | Top Glove TSR F44SLP 2 Piping Project - Site Erection Work (RT,MT,PT)
| August 2021 – October 2022
| Banting, Selangor
| Grace Field Corporation Sdn Bhd
|
27 | RAPID Project – Package 2
| August 2021 – May 2022
| Pengerang, Johor
| Sinopec Engineering Group Malaysia Sdn Bhd
|
28 | Pre-Fabrication Work - Top Glove MEPI F44SLP 2 Piping Project (RT,PT)
| August 2021 – March 2022
| Pengerang, Johor | Grace Field Corporation Sdn Bhd
|
29 | 2190272 Jeroco Project – NDT Services Work (RT,MT)
| August 2021
| Lahad Datu, Sabah
| Mackenzie Industries Sdn Bhd
|
30 | Term Contract For Sabah Sarawak Mechanical Pipelines Maintenance (Package A) – NDT Work (RT,MT,PMI,UT,PAUT,TOFD)
| July 2021 – May 2022
| Putatan, Sabah
| Thermal Tech Engineering & Services Sdn Bhd
|
31 | Provision of 3rd Party Services To Supply NDT Manpower And Equipment For Sepat Platform (RT,MT,PT)
| July 2021 – September 2021
| Kemaman, Terengganu
| HHA Associates Sdn Bhd
|
32 | Water Pipeline Project – NDT Work (MT)
| July 2021
| Labuaya, Tuaran, Sabah
| PWMW Construction Sdn Bhd
|
33 | Provision of 3rd Party Services To Supply NDT Manpower And Equipment For Tembikai Platform (RT,MT,PT)
| July 2021
| Kemaman, Terengganu
| HHA Associates Sdn Bhd
|
34 | NDT Services (RT,PT) For Superheater Upgrading Work
| June 2021
| Kinabatangan Sabah
| Cash Horse (M) Sdn Bhd
|
35 | EPCC For New Air Compressor Project (NAP) at Gas Processing Santong – NDT Work (RT,MT,PT,PMI,PAUT)
| January 2021 – August 2022
| Paka, Terengganu
| CTCI-MIE Industrial Sdn Bhd
|
36 | Provision Of NDT Services –GSPP Cogeneration Plant (PAUT,RT,MT,PT)
| October 2020 – March 2021
| Banting, Selangor
| Shinryo (Malaysia) Sdn Bhd
|
37 | Provision for NDT Services for RAPID Package 11 Project (RT,UT,MT,PT,HT,FT)
| January 2020 – September 2020
| RAPID, Pengerang, Johor
| Samsung Engineering (M) Sdn Bhd
|
38 | EPCC Contract Of Phase 1E For Expansion Of PITSB Terminal – Intel Terminal Connecting Pipeline (ITCP) – NDT Work (RT,MT,PT)
| November 2019 – June 2020
| Pengerang, Johor | Dialog Plant Services Sdn Bhd
|
39 | DF2003 - Fabrication, Blasting & Paint, Delivery & Assembly Steel Jetty Piperack Modules For Pengerang Tank Facilities (PCTF)
| November 2019 – March 2020
| Pengerang, Johor | Dialog Fabricators Sdn Bhd
|
40 | DF2006 - Fabrication, Blast & Painting, Assembly & Delivery Of LPS Piping Skid - NDT Work (RT,MT)
| November 2019 – June 2020
| Pengerang, Johor | Dialog Fabricators Sdn Bhd
|
41 | P19436 – Pengerang Refining: Provision Of Maintenance Mechanical Services, NDT Work
| October 2019 – March 2020
| Pengerang, Johor | Dialog Plant Services Sdn Bhd
|
42 | EPCC Of Pengerang Deepwater Terminal Three Development for Tank Terminal Facility For PT5SB At Pengerang, Johor Darul Ta’zim – NDT Works (RT,UT,MT,PT)
| September 2019 – June 2021
| Pengerang, Johor
| Dialog E & C Sdn Bhd
|
43 | DH1943 – SHELL Westport TK-02 Bottom Plate Replacement Project – NDT Work (RT,MT,PT,UT)
| September 2019 – March 2020
| Port Klang, Selangor
| Dialog E&C Sdn Bhd
|
44 | DF1907-MES Central Java Water Intake Project - NDT Works (RT,UT,MT,PT,PMI,HT,FT)
| May 2019 – December 2019
| Pengerang, Johor
| Dialog Fabricators Sdn Bhd
|
45 | Provision for NDT Services For RAPID Project Package 2 (RT,UT,MT,PT,PMI,HT,FT)
| May 2019 – November 2021
| RAPID, Pengerang, Johor
| Sinopec Engineering Group Malaysia Sdn Bhd
|
46 | Warm Propylene Line - NDT Works (RT,PMI)
| January 2019 – December 2019
| Pengerang, Johor
| Dialog Plant Services Sdn Bhd
|
47 | DH1816 - Refurbishment And Modification Langsat Terminal (Three) Sdn Bhd - NDT Works (RT,UT,MT,PT,HT,FT,PMI)
| November 2018 - June 2020
| Tanjung Langsat, Johor
| Dialog E&C Sdn Bhd
|
48 | EPCC Contract of Phase 1E For Expansion of PITSB Terminal - NDT Works (RT,UT,MT,PT,PMI,FT,HT)
| July 2018 – January 2020
| RAPID, Pengerang Johor
| Dialog Plant Services Sdn Bhd
|
49 | NDT services for PETRONAS Rapid P29 C4 Project (RT,MT,PT)
| March 2018 – November 2019
| RAPID, Pengerang Johor
| Sino TCC (M) Sdn Bhd
|
50 | Pengerang P28 Project – NDT Work (RT,MT,PT,PMI)
| July 2017 – April 2019
| RAPID, Pengerang, Johor
| Dynaciate Engineering Sdn Bhd
|
NO | DESCRIPTIONS | DURATION / PERIOD | LOCATION | CLIENTS |
---|---|---|---|---|
51 | NDT Services for Rapid SCC Pengerang Project (RT,MT,PT,UT,PMI)
| December 2016 – November 2018
| RAPID SCC, Pengerang, Johor
| Equator Engineering Sdn Bhd
|
52 | Provision of NDT Works Services For PGBS Ulu Tiram – Pengerang Pipeline (RT X-Ray,MT,PT)
| August 2016 - 2017
| Ulu Tiram, Johor
| Rafco Solution Sdn Bhd/ PBJV Group Sdn Bhd
|
53 | Rapid SCC Project – NDT Work (RT,MT,PT,PMI)
| March 2016 – 2017 | Quench Area
| Eversendai Oil & Gas (M) Sdn. Bhd.
|
54 | Rapid SCC Project – NDT Work (RT,MT,PT,UT)
| March 2016 – 2017 | TOWER DRESS UP
| Eversendai Oil & Gas (M) Sdn. Bhd.
|
55 | Field Erected Tanks – NDT Work (RT,MT,PT,UT,PAUT)
| March 2016 – 2017 | RAPID, Pengerang, Johor (PKG 14-1400)
| ICE Petroleum Engineering Sdn. Bhd.
|
56 | Mechanical Erection Work WCCT – NDT Work (RT)
| March 2016 – 2017 | RAPID EPCC Pengerang, Johor
| IAQ Solutions Sdn. Bhd.
|
57 | To supply Qualified Manpower and Equipment to carry out RT, MT,PT and UT work services
| March 2016 – 2017
| EPCC Pengerang CP
| MMC Engineering Services Sdn. Bhd.
|
58 | RAPID P3 – NDT Work (RT,PWHT,MT,PT,HT,PMI,FT,PAUT)
| February 2016 – February 2019
| RAPID, TR
| CN Eleco Engineering Sdn. Bhd.
|
59 | PETRONAS RAPID Project Package 14 - Pipeline
| 2016 - 2019
| RAPID Pengerang, Johor
| IU&I (OUIJV)
|
60 | Scrapper Launcher & Receiver Station and Block Valve Station – NDT Work (RT,MT,PT)
| January 2016-2017
| RAPID EPCC Pengerang Gas Pipeline
| Asia Propel Sdn. Bhd.
|
61 | Rapid P1 Onshore Project – NDT Work (RT,PWHT,MT,PT,PMI,HT,FT,PAUT)
| December 2015 – July 2019
| RAPID, Pengerang Johor
| Sino TCC (M) Sdn. Bhd.
|
62 | Pengerang Cogeneration 1220MW Power Plant Project – NDT Work (RT,PWHT,MT,PT,HT,PMI,FT,UT)
| December 2015 – September 2018
| RAPID, Pengerang, Johor
| Equator Engineering Sdn Bhd
|
63 | RAPID P1 Project – NDT Work (RT, PWHT,MT,PT,PMI,HT,FT,UT, PAUT)
| December 2015 – October 2018
| RAPID, P1 RFCC M, M&I
| CN Eleco Engineering Sdn. Bhd.
|
64 | Janakuasa Manjung Project – NDT Work (RT,MT,UTTG)
| November 2015 - 2017
| Manjung, Perak
| Visible Wave Sdn. Bhd.
|
65 | To supply Qualified Manpower and Equipment to carry out RT,MT and PT work services.
| November 2015 - 2017
| Klang Valley, Selangor
| Asia Propel Sdn. Bhd.
|
66 | PSR-I & PSR-II Revamp Project – NDT Work (RT)
| October 2015 - 2016
| Melaka
| Visible Wave Sdn. Bhd.
|
67 | To supply Qualified Manpower and Equipment to carry out Radiography Testing (RT), UT and MT work services.
| September 2015 - 2016
| Puchong, Selangor
| EPCF Prima Sdn. Bhd.
|
68 | To supply Qualified Manpower and Equipment to carry out Radiography Testing (RT & X-Ray), MT,PT and UT work services
| September 2015 - 2016
| Nilai, Negeri Sembilan
| Tunas Asal Sdn. Bhd.
|
69 | To supply Qualified Manpower and Equipment to carry out Radiography Testing (X-Ray and Gamma) MT & PT work services at Klang Workshop
| September 2015 - 2016
| Operation II NGT Dept.
| Transwater API Sdn. Bhd.
|
70 | Radiography Testing (RT) work services at Nilai Workshop
| September 2015 - 2017
| Nilai, Negeri Sembilan
| Tenaga Tiub Sdn. Bhd.
|
71 | SAMUR Project – NDT Work (PMI)
| August 2015 – November 2015
| Sipitang, Sabah
| Pioneer Heat Treatment Sdn. Bhd.
|
72 | To supply Qualified Manpower and Equipment to carry out NDT Work Services (RT,PT,UT)
| August 2015
| UEC Workshop
| U.E.C. Sdn. Bhd.
|
73 | Sapura Kencana – NDT Work (RT)
| July 2015 – November 2015
| Lumut, Perak
| Bumitech Inspection & Services Sdn. Bhd.
|
74 | 1451/15 Project – NDT Work (RT)
| July 2015 – November 2015
| Teluk Panglima Garang, Banting, Selangor
| Bumitech Inspection & Services Sdn. Bhd.
|
75 | MLS Brunei Project – PWHT & PAUT Work
| July 2015
| Gebeng Workshop, Kuantan
| PT Technic Eng. Sdn. Bhd.
|
76 | To supply Qualified Manpower and Equipment to carry out NDT Work (UT,RT,MT,PT,HT,FT,PMI,PAUT)
| May 2015 – September 2018
| RAPID, Pengerang, Johor
| Overseas Manufacturing (Johor) Sdn. Bhd.
|
77 | Provision of NDT Services Works On Pipeline Sepang – KLIA (RT X-Ray, MT ,PT)
| April 2015
| Sepang, Selangor
| Diversified Eng. Sdn. Bhd.
|
78 | PAUT Work services at EN355 Material
| March 2015 | OMJ Workshop
| Overseas Manufacturing (Johor) Sdn. Bhd.
|
79 | PWHT and Pre-Heating Test (HT) work services for MLS Brunei Project
| March 2015 | Gebeng Workshop
| PT Technic Engineering Sdn. Bhd.
|
80 | Provision of NDT Services Works For Offshore Pipeline Bintulu to Offshore on Barge (RT X-Ray, MT) | March 2015 | Bintulu, Offshore | Oceaneering Services |